We build the future. Now we must transform it. 

hola

The buildings we live in today will be part of tomorrow’s cities. Decarbonizing their operation is essential to reduce the climate impact of the built environment. 

In mature economies, close to 80% of the buildings that will still be standing in 2050 are already built. Reducing emissions from buildings in operation is essential to reaching net zero, with measurable and manageable results.

The existing building is the key lever 

The sector’s transformation potential goes beyond new construction. According to the IEA’s estimate in its Breakthrough Agenda Report 2025, in mature economies —such as the United States, Canada, the countries of Western Europe, and Japan— close to 80% of the buildings that will exist in 2050 are already built.1 Decarbonizing the asset that is already in operation is therefore where the reduction potential is concentrated. 

The scale of the sector confirms this: buildings and construction account for close to 37% of global CO₂ emissions, 28% of energy consumption, and almost 50% of material extraction.2 


Huasteco Alfa
LEED Gold® O+M: Existing Buildings v4.1

Why plan now? Value at risk and access to capital 

Global energy intensity improved 8.5% since 2015, but progress is not keeping pace with construction: in 2024, renewables covered 17.3% of buildings’ energy demand.2 To align the sector with a net-zero pathway, investment in efficiency must reach USD 5.9 trillion by 2030, equivalent to USD 592 billion per year.2 

Just as it is important to evaluate different pathways at the beginning of a project to define the most appropriate sustainability strategy—as we explain in our article How to Choose the Right Path for Your Project—the challenge for an existing building lies in identifying opportunities for improvement and turning them into measurable actions.

Stranded asset risk. Every building has a carbon-emissions reduction pathway that depends on its location and type. Moving away from that pathway can increase its exposure to financial and regulatory risks, as well as the costs required to adapt to future requirements. 

Environmental data is now reportable. In Mexico, since 2026, securities issuers report under the IFRS S1 and S2 standards by resolution of the CNBV, with fiscal-year 2025 data;3 the CINIF’s Sustainability Information Standards require entities that report under NIF to disclose sustainability indicators.4 A building’s performance is no longer a reputational matter and now shapes valuation, cost of capital, and access to financing. 


The strategy: from measurement to decarbonization 

Decarbonizing an asset in operation is a sequence. Following an order makes it possible to reduce costs and avoid misdirected investment. 

  • Baseline and measurement. The first step is to know how much energy the building consumes and what emissions it generates during operation. This involves analyzing bills and consumption records, carrying out energy audits, and metering the consumption of the main systems, such as HVAC and lighting. This information makes it possible to establish a starting point, identify savings opportunities, and track the progress of decarbonization actions.5 
  • Setting decarbonization targets. Define how much the building’s emissions must be reduced and by when, considering its location and type, as well as the climate goal of limiting global warming to 1.5 °C. This reference makes it possible to assess whether the building is advancing at the expected pace and to identify financial and regulatory risks associated with insufficient performance. 
  • Sequencing the interventions. First, reduce energy demand through improvements to the building envelope—such as thermal insulation, windows, and solar control—and passive design solutions. Then, optimize HVAC systems, lighting, and controls through building management systems (BMS) that adjust operation to actual needs. Commissioning and recommissioning verify that equipment works correctly and correct deviations without the need for major capital investment. As combustion equipment reaches the end of its service life, it can be replaced with electric alternatives. Renewable energy, generated on-site or procured through supply contracts, helps cover the remaining consumption. Finally, offsetting is reserved for emissions that cannot be eliminated directly. 
Américas 1905
LEED Gold® O+M: Existing Buildings v4.1

From THREE’s experience in the industrial sector, we have observed that energy diagnostics and commissioning are key tools for identifying improvement opportunities in building operation. Detecting deviations in system performance and correcting them can generate favorable returns without necessarily requiring major capital investment. This reinforces the importance of starting from a diagnostic before defining interventions and allocating resources to larger-scale improvements. 

  • Reducing embodied carbon. In deep renovations, the emissions associated with construction materials—from manufacturing to installation—must also be considered. LEED v5 reinforces the importance of assessing and reducing these emissions, as well as prioritizing the conservation and reuse of structures and materials. These strategies reduce the environmental impact of interventions and avoid emissions associated with demolition and new construction. 

Planning and execution: a phased roadmap 

  • Prioritization by risk and return. Order the interventions according to their potential impact on emissions reduction, expected savings, and exposure to financial and regulatory risks. Give priority to the assets that require the most urgent action. 
  • Investment planning. Distribute investments according to the building’s needs and equipment replacement cycles. Taking advantage of the moment when equipment reaches the end of its service life makes it possible to incorporate efficiency improvements and avoid investments that would later have to be replaced prematurely. 
  • Ownership and monitoring. Define who will be responsible for each action, set interim targets, and track energy consumption and carbon emissions indicators. Reviewing results periodically makes it possible to assess progress and adjust measures based on outcomes. 
  • Certification as a framework for action and verification. Frameworks such as LEED v5 for Operations and Maintenance (O+M), for example, incorporate the projection of carbon emissions associated with energy consumption and include long-term decarbonization plans. This framework helps structure the actions, set timelines, and assess the building’s performance through a certification process with independent third-party review.
TRANE Monterrey
LEED Silver® O+M: Existing Buildings v4.1

From strategy to implementation 

Effective decarbonization requires a clear strategy, phased planning, and implementation aligned with the needs of each building. Following a sequence makes it possible to identify opportunities, prioritize interventions, and direct investments toward the actions with the greatest impact, without losing sight of environmental and operational objectives. 

More than adopting technologies in isolation, it is about understanding the context of each asset, setting priorities, and measuring results to adjust actions over time. In this way, decarbonization becomes a structured process that reduces emissions, improves efficiency, and advances toward more sustainable operation. 

References 

1.  IEA. Breakthrough Agenda Report 2025 (Buildings). 

2.  UNEP and GlobalABC. Global Status Report for Buildings and Construction 2025–2026. 

3.  CNBV. Resolution on sustainability disclosure for securities issuers (Official Gazette of the Federation, 28 January 2025). 

4.  CINIF. Sustainability Information Standards (NIS A-1 and NIS B-1). 

5.  GRESB. 2025 Real Estate Assessment Results.