General description

Eaton

Location:Guadalupe, Nuevo León
Category:Industrial

New manufacturing facility for Eaton Corporation, a company dedicated to the production of electrical systems.


The project is located in the FINSA Guadalupe Industrial Park.

Services:Environmental Consulting, Energy Modeling
Certifications:
Pursuing LEED® BD+C: New Construction v4

Client

image

Eaton Corporation is a power management company and a market leader. 


FINSA develops industrial real estate projects and manages one of the largest portfolios in Latin America.


The Eaton Guadalupe plant is its new project aimed at expanding its presence in the Mexican market.

Project

Sustainability Strategies


The project integrates environmental solutions focused on mobility, energy efficiency, water savings, and responsible materials management.


  • A 30% reduction in parking spaces was achieved compared to the ITE standard, and more than 45 daily community transport trips are provided to reduce the use of private vehicles.


  • The building incorporates low-consumption fixtures that enable 48% water savings, LED lighting achieving over 60% energy reduction compared to the baseline case, and a 500 kW photovoltaic system that generates 5% of the building’s annual energy demand.


  • Additionally, 23% of the materials used contain recycled content, comprehensive waste separation is promoted, and the design incorporates passive strategies such as reflective exterior walls (72% of the total façade area) and fresh air injection through the HVAC system to enhance indoor environmental quality.
image

Results

Quantifiable impact from design to operation.

31%

Energy savings

5%

On-site solar energy generation

49%

Indoor water savings

100%

Outdoor water savings

Contact

Find out how to transform your project.