
General description
FINSA Multi III Querétaro
Location:Santiago de Querétaro, Querétaro
Category:Industrial
FINSA Multi III Querétaro is an industrial building located in the municipality of Santiago de Querétaro, Querétaro.
It comprises speculative warehouse, manufacturing, and office areas, along with a gatehouse.
This industrial facility has been designed and built with a comprehensive approach aimed at generating positive environmental impacts and promoting energy efficiency.
Services:
Certifications:
Proudly pursuing LEED BD+C: Core and Shell v4.1

Client

FINSA develops industrial real estate projects and manages one of the largest portfolios in Latin America.
As part of its commitment to sustainability, FINSA enrolled in the LEED Volume Certification program and adopted best practices and procedures for the development of its multi-tenant buildings.
Project
Explore the project
Energy
- 17% savings in energy consumption compared to the baseline building, through efficient envelope materials and HVAC equipment using refrigerant with zero ozone depletion potential and low global warming potential.
- 89.94% of the regularly occupied area reaches optimal lighting levels with daylight alone, reducing the use of artificial lighting and its associated electricity consumption.
Water
- 100% reduction in potable water use for irrigation through a low-consumption landscape with xeric plants.
- 57.47% reduction in indoor water use with low-flow plumbing fixtures.
Mobility
- Preferred parking spaces and electric vehicle charging stations that encourage the use of efficient, low-emission vehicles.
Construction and waste
- Construction waste density of just 29.59 kg/m² through proper waste management.
- Monitoring of soil erosion, waterway sedimentation, and airborne dust during construction to reduce the resulting pollution.
Management and certification
- Project oversight by a LEED Accredited Professional to streamline the application and certification process.
- Additional policies for the sustainable management of the building during operation.

