Summary
Plaza Central
Location: Monterrey, N.L.
Category: Offices
An emblematic complex in Monterrey, it provides its occupants with an environment for recreation and work efficiency in the midst of nature, with 6,800 square meters of green areas. This place offers to more than 3,500 people ample parking, commercial areas and high quality amenities. In addition, its strategic location facilitates access to the city's main roads and areas such as Valle in San Pedro, the western zone in Santa Catarina, Cumbres and Downtown.
Services: Environmental Consulting, ASHRAE Level 1 Audit
Certifications :
LEED Gold® O+M: Existing Buildings v4.1
Company
About Fibra MTY
Fibra MTY stands out as the first fully managed and internally advised real estate investment trust. It specializes in acquiring and managing an exclusive set of high-quality corporate properties focused on the office and industrial sectors. Transforms the real estate profitability landscape through a transparent and consistent business model. Operates under the highest standards of environmental, social and governance (ESG) responsibility, ensuring the protection of its stakeholders' interests.
Project
Plaza Central and its impacts
The project's current performance was analyzed in terms of transportation, energy, water, waste, and human experience. To optimize its operations, best practices were implemented for the efficient use of energy and the reduction of water consumption, as well as air quality and integrated waste management policies.
Challenges
The challenges to be faced
The building performance analyses involved an initial assessment that included an ASHRAE Level 1 audit. This audit identified the most relevant aspects in terms of impact, cost and execution time, thus establishing a critical path for the actions to be taken.
Solution
How was it resolved?
The building performance analyses involved an initial assessment that included an ASHRAE Level 1 audit. This audit identified the most relevant aspects in terms of impact, cost and execution time, thus establishing a critical path for the actions to be taken.
Results
What did you obtain?
100%
Of the total number of users surveyed, responded to their experience in the building as "satisfactory" and "extremely satisfactory"
50%
Of the total number of surveyed users use alternative means of transportation
72 puntos
From a maximum rating of 100 points for energy efficiency